Saturday, March 26, 2011
EGYPTAIR S11 changes to Bangkok and Paris as of 25MAR11
Latest update as of 25MAR11, affected destinations are Bangkok and Paris. Details as follows:
Cairo – Bangkok 01APR11 – 28APR11 (BKK dep 03APR11 – 30APR11) Boeing 777-300ER replace A330-200
MS960 CAI2245 – 1315+1BKK 77W D
MS961 BKK0215 – 0630CAI 77W D
Cairo – Paris CDG Planned Boeing 777-300ER service from 27MAR11 is CANCELED, instead service to be operated by the new Airbus A330-300
Source
Friday, October 15, 2010
EGYPTAIR Latest changes to Bangkok and Guangzhou as of 15OCT10
From 15DEC10, EGYPTAIR is to operate NONSTOP Cairo – Guangzhou service, replacing 1-stop service via Bangkok. As a result, Cairo – Bangkok will operate as Daily terminator flight.
Both route operates with Boeing 777-200ER aircraft.
Latest schedule as per 15OCT10 GDS timetable display as follows:
Cairo – Bangkok
MS960 CAI2240 – 1200+1BKK 777 D
MS961 BKK0050 – 0555CAI 777 D
Cairo – Guangzhou
MS958 CAI2315 – 1500+1CAN 777 x247
MS959 CAN2330 – 0555+1CAI 777 x135
Friday, October 1, 2010
EGYPTAIR drops plan of A330 service to Bangkok/Guangzhou in W10
As per 30SEP10 GDS timetable display, EGYPTAIR has canceled its plan to operate Airbus A330-200 aircraft on 4 weekly Cairo – Bangkok – Guangzhou service during selected periods in Winter 2010 season.
Boeing 777-200ER to continue operate this route.
The Star carrier in the past 4 weeks has been shifting operating aircraft back-and-forth between A330 and 777 on this route.
Friday, September 24, 2010
EGYPTAIR W10 Aircraft swap to Bangkok/Guangzhou/Khartoum
As per 24SEP10 GDS timetable display, EGYPTAIR further adjusted planned aircraft changes in Winter 2010 season on Bangkok, Guangzhou (Airbus A330-200/Boeing 777 adjustments) and Khartoum (New Airbus A330-300 service) route.
Details:
Cairo – Bangkok 3 weekly
Planned Airbus A330-200 replacing 777 on certain periods in Winter 2010, shelved
Cairo – Bangkok – Guangzhou 4 weekly
Planned Airbus A330-200 replacing 777 on certain periods in Winter 2010 is to go ahead:
15DEC10 – 25DEC10
05FEB11 – 23FEB11
Cairo – Khartoum NEW Airbus A330-300 aircraft enter service eff 01JAN11, on:
MS853/854 Day x2
Monday, September 13, 2010
EGYPTAIR W10 Operation Changes as of 13SEP10
As per 13SEP10 GDS timetable display, EGYPTAIR’s latest changes to planned 2010/11 Winter season operation, as follows. This includes a new destination to Lusaka in Zambia, from January 2011.
Service to Almaty in Kazakhstan, is canceled.
Details:
Almaty
2 weekly Cairo – Almaty service canceled from 02NOV10. It is continuing service to Almaty through existing codeshare service with Turkish Airlines
Bangkok/Guangzhou
Airbus A330-200 replace Boeing 777-200ER on following periods:
11DEC10 – 25DEC10
05FEB11 – 23FEB11
Lusaka New 4 weekly service eff 16JAN11.
Service operates as Cairo – Dar es Salaam – Lusaka, which affects operational schedule on DAR to CAI sector
till 15JAN11
MS841 CAI2210 – 0500+1DAR 320 x135
MS842 DAR0600 – 1045CAI 320 x246
eff 16JAN11
MS841 CAI2230 – 0520+1DAR0620+1 – 0750+1LUN 320 x135
MS842 LUN2150 – 0120+1DAR0215+1 – 0700+1CAI 320 x246
Departure from DAR to CAI is Day x357